Memo documenting a modification to the 2016 sampling schedule in the AOC 4 Short-Term Monitoring (STM) plan for Phase 1 of the remedy. It states 2016 STM will remain the same as 2015 and include stations STMP-01, STMP-05, and STMP-07, with additional locations to be added as remedial design progresses.
File Type:
pdf
Categories:
South River Remediation Documents
Publication Date :
2016-05-09
Type :
Correspondence
Review Notes :
Document is a consultant memorandum (AECOM) about monitoring for the AOC 4 remedy; categorized as South River Remediation Documents because it directly addresses remedy monitoring. Document type set to Correspondence. No other substantive uncertainties.
