Slide deck summarizes corrective actions at the Former DuPont Waynesboro Plant (July 17, 2013). It outlines Railroad Avenue interim measures including installation of filtration sumps (bench testing and design), sewer abandonment/repair/rerouting (smoke testing, utility/topo surveys), cleaning and sliplining, and PHS sump cleanout, with a map and schedule through 2015.
File Type:
pdf
Categories:
South River Remediation Documents
Publication Date :
2013-07-17
Type :
Presentation
Review Notes :
This is a remediation-focused slide presentation dated July 17, 2013. Category assigned to South River Remediation Documents because the content details interim corrective/remediation actions. The PDF does not identify a presenter, authoring organization, or explicit meeting context, so those details were not inferred.