Serving Waynesboro, Augusta County & the Shenandoah Valley

Search

Serving Waynesboro, Augusta County & the Shenandoah Valley

Slide presentation summarizing Phase 1 remedial design work for South River (RRM 0–2) from May 2015. Topics include estimated bank total mercury loading, delineation of Primary and Secondary Bank Management Areas (BMAs), bank stabilization and habitat-protection concepts for different habitat qualities, conceptual cross-sections, and a schedule with next steps for sampling, stakeholder design development, permitting, and final design in early 2016.

File Type: pdf
Categories: Presentations
Tags: AECOM, Anchor-QEA, bank stabilization, bank-management-areas, dgif, DuPont, mercury, Phase 1A, RRM 0-2, south-river
Publication Date : 2015-05
Type : Presentation
Review Notes : The slide deck is dated May 2015 and contains logos for DuPont, AECOM, and Anchor QEA, but no explicit author or meeting name is shown. The deck focuses on Phase 1 (RRM 0–2). Numeric details visible on slides (e.g., Primary BMAs as ~5% of banks and unit loading >20 kg Hg/mi-yr) were referenced directly; no other facts were inferred.

Leave a Reply

Your email address will not be published. Required fields are marked *