AECOM summarized 2022 leaf-off bank management area (BMA) inspections along the South River (Constitution Park, City Shops, Allied Ready Mix, Shiloh Baptist Church, North Park) performed in January 2023. The memorandum documents vegetation establishment, bank stability, condition of installed rock toe/geocell/LWD features, invasive plant presence (Japanese knotweed), and recommended maintenance.
File Type:
pdf
Categories:
Technical Documents
Publication Date :
2023-09-15
Type :
Monitoring Report
Review Notes :
The memorandum is dated 2023-09-15 (cover page). Inspection field work was conducted January 17–19, 2023; the chosen document_date reflects the memo/report date rather than the field visit dates.