Slide deck presents remedial design update for South River Phase 1A bank stabilization. It describes three remedy objectives (reduce mercury loading, maintain/improve habitat, minimize disruption), maps Bank Management Areas including Constitution Park and the WWTP, shows primary/secondary BMA designs for varied slopes, removal prisms, and a schedule targeting final design in spring 2016 and construction in summer 2016.
File Type:
pdf
Categories:
South River Remediation Documents
Publication Date :
2016-01
Type :
Presentation
Review Notes :
The PDF is a slide presentation dated January 2016 by Clay Patmont about Phase 1A bank remedy design. Category chosen as South River Remediation Documents because content is remediation-focused; it could alternatively be filed under Presentations or SRST Meeting Documents if this deck was specifically delivered at a South River Science Team meeting (no explicit meeting metadata in the PDF).