Slide deck presents remedial design update for South River Phase 1A bank stabilization. It describes three remedy objectives (reduce mercury loading, maintain/improve habitat, minimize disruption), maps Bank Management Areas including Constitution Park and the WWTP, shows primary/secondary BMA designs for varied slopes, removal prisms, and a schedule targeting final design in spring 2016 and construction in summer 2016.

File Type: pdf
Categories: South River Remediation Documents
Tags: AECOM, Anchor-QEA, bank stabilization, bank-management-area, constitution-park, DuPont, mercury, Phase 1A, remedial-design, south-river, wastewater-treatment-plant
Publication Date : 2016-01
Type : Presentation
Review Notes : The PDF is a slide presentation dated January 2016 by Clay Patmont about Phase 1A bank remedy design. Category chosen as South River Remediation Documents because content is remediation-focused; it could alternatively be filed under Presentations or SRST Meeting Documents if this deck was specifically delivered at a South River Science Team meeting (no explicit meeting metadata in the PDF).

Leave a Reply

Your email address will not be published. Required fields are marked *