This Virginia DEQ monitoring plan presents a 100-year schedule for mercury monitoring in the South River and South Fork Shenandoah River. A matrix lists planned sampling of fish, sediments, water, and floodplain at multi-year intervals, with a consultant report every ten years and a special data review following a 100-year flood event.
File Type:
pdf
Categories:
Technical Documents
Publication Date :
Type :
Work Plan
Review Notes :
No explicit publication or creation date visible in the PDF; the WordPress upload date was not used. The document is a long-term monitoring plan (interpreted as a work plan) based on the title and the scheduling matrix; if a different internal classification is required, consider 'Monitoring Report' but the PDF itself labels it a 'monitoring plan'.
