This memorandum summarizes June and October 2016 short-term monitoring (STM) conducted at three stations (STM-01, STM-05, STM-07) in RRM 0–2 downstream of the former DuPont Waynesboro site (AOC-4). It presents sediment, filtered pore water, periphyton, transplanted Corbicula, riparian vegetation, canopy, substrate grain-size, and habitat/public-access observations and preliminary seasonal/spatial trends.
File Type:
pdf
Categories:
Technical Documents
Publication Date :
2017-03-01
Type :
Monitoring Report
Review Notes :
Chose 'Technical Documents' because this is a monitoring/results memo; the work is related to remediation but the file itself is an STM data summary rather than a formal remediation decision document.
