AECOM memorandum (dated 2023-09-14) summarizing 2022 leaf-on maintenance inspections for five Bank Management Areas (Constitution Park, City Shops, Allied Ready Mix, Shiloh Baptist Church, and North Park) at the former DuPont Waynesboro Site (AOC 4). Inspections found generally stable bank treatments, established vegetation, localized scour and exposed roots in non‑remediated sections, and recommended invasive-species control and continued monitoring.
File Type:
pdf
Categories:
Technical Documents
Publication Date :
2023-09-14
Type :
Monitoring Report
Review Notes :
Memo header date is 2023-09-14 (used as document_date). A VDEQ cover letter in the PDF references receipt/submission in October 2023 and a March 2024 review acknowledgment; those are administrative dates and not used as the memorandum date. No other publication date visible.