AECOM memorandum (dated Sep 18, 2023) summarizing 2023 leaf-on maintenance inspections conducted June 2 and June 14–15, 2023 at five Phase 1A Bank Management Areas (Constitution Park, City Shops, Allied Ready Mix, Shiloh Baptist Church, North Park) in Waynesboro. Findings: generally stable bank treatments, vegetation establishment, variable Japanese knotweed cover, exposed geocell in places; recommended invasive control and localized repairs.
File Type:
pdf
Categories:
Technical Documents
Publication Date :
2023-09-18
Type :
Monitoring Report
Review Notes :
Document date set to the memorandum date (2023-09-18). Inspections occurred on June 2, 14 and 15, 2023 and are described in the memo and attachments; the memo compiles those inspection results. Category chosen as Technical Documents (monitoring/inspection report) rather than South River Remediation Documents because this is an inspection/maintenance memorandum rather than a regulatory remediation decision.