This conference poster presents a case study of adaptive management to optimize a pilot bank-stabilization remedy for mercury-impacted sites on Virginia’s South River. A 500-foot pilot reach was constructed; monitoring showed temporary increases in near-bank inorganic mercury pore water immediately after construction but consistent declines in sediment and pore-water IHg within three to five years. Interim measures aim to address ~60% of bank loading.
File Type:
pdf
Categories:
Presentations
Publication Date :
1905-07-10
Type :
Presentation
Review Notes :
Document is a conference poster (SETAC North America, 4-8 Nov 2018); date returned as year only because the poster lists conference dates rather than a formal publication date. All summary facts are taken directly from poster text and figures; no additional inferences were made.