Serving Waynesboro, Augusta County & the Shenandoah Valley

Search

Serving Waynesboro, Augusta County & the Shenandoah Valley

AECOM summarized a leaf-off maintenance inspection of the Allied Ready Mix Bank Management Area (BMA) conducted Feb 5, 2019 (memo dated Mar 4, 2019). Remediated banks were generally stable and rock toes intact, but December high flows displaced mid-bank container stock, exposing geocell and causing localized scour. Planned repairs include backfilling, fabric repair, and replacement plantings before the spring growing season.

File Type: pdf
Categories: South River Remediation Documents
Tags: 2019, AECOM, allied-ready-mix, Area of Concern 4, bank-management-area, DuPont, erosion-control, geocell, maintenance inspection, riverbank stabilization, south-river
Publication Date : 2019-03-04
Type : Monitoring Report
Review Notes : The PDF contains a March 4, 2019 memorandum summarizing the Feb 5, 2019 inspection and a DEQ acknowledgement letter dated May 15, 2019. I used the memorandum date (2019-03-04) as the document_date because it is the report authoring date.

Leave a Reply

Your email address will not be published. Required fields are marked *