Slide presentation for the South River Science Team (April 24, 2020) summarizing AOC 4 interim bank measures. Covers Phase 1 work at Constitution Park, City Shops, Allied Ready Mix, Shiloh Baptist Church and North Park; site preparation, cofferdam installation, focused excavation, riprap trenching, planting schedule, enhanced adaptive management, and a bank soil assessment (RRM 2-3). Includes schedule and monitoring context.

File Type: pdf
Categories: SRST Meeting Documents
Tags: AOC-4, bank-management, constitution-park, mercury, north-park, remediation, Shiloh Baptist Church, south-river, south-river-science-team, Waynesboro
Publication Date : 2020-04-24
Type : Presentation
Review Notes : Category chosen as SRST Meeting Documents because the slide deck is explicitly for a South River Science Team meeting (title slide). Document date taken from the meeting date shown on slides. The slide graphic shows estimated percent mercury reduction but an exact numeric value was not asserted because the gauge graphic is not unambiguously labeled.

Leave a Reply

Your email address will not be published. Required fields are marked *