This report presents the 2015 baseline short‑term monitoring (STM) results for AOC 4 of the Former DuPont Waynesboro Site (RRM 0–2) to evaluate pre‑remedy bank stability, mercury loading, and exposure. Methods and data for sediment, pore water, periphyton, transplanted Corbicula, and habitat metrics are summarized to support evaluation of Phase 1 interim bank stabilization measures.
File Type:
pdf
Categories:
Technical Documents
Publication Date :
2016-10
Type :
Monitoring Report
Review Notes :
The PDF contains the October 2016 STM report and an appended Virginia DEQ acceptance letter dated October 10, 2017. Classification chosen as Technical Documents because the file is a monitoring report; although related to remediation actions, it is primarily a monitoring dataset and evaluation rather than a formal remediation decision or permit.
