AECOM documents post‑construction bank repair activities at the Constitution Park and Allied Ready Mix Bank Management Areas (South River AOC 4). Repairs performed April–May 2019 included geocell infill, replacement/patching of erosion control blankets and coir matting, installation of coir logs, live‑stakes and plugs, and hydroseeding. Daily construction reports, quantities, and monitoring plans are included.
File Type:
pdf
Categories:
South River Remediation Documents
Publication Date :
2019-05-23
Type :
Progress Report
Review Notes :
Document date taken from AECOM memo (May 23, 2019). The PDF also contains a Virginia DEQ acceptance letter dated June 14, 2019; primary document treated as the AECOM post‑construction memo. Document type assigned as Progress Report because it records completed repair activities and includes daily construction reports; it is also a remediation record.