Addendum to the North Park Technical Execution Plan describing pre-design soil sampling, laboratory analysis, and a focused floodplain soil excavation at North Park (Former DuPont Waynesboro Site, AOC 4). Presents total-mercury data, compares exposure-point concentrations to site-specific screening levels, documents a revised 0–0.5 ft surficial excavation to preserve large trees, and describes excavation, backfill, restoration, waste management, and institutional controls.
File Type:
pdf
Categories:
South River Remediation Documents
Publication Date :
2020-12
Type :
Work Plan
Review Notes :
Document is the AECOM addendum dated December 2020 (cover page). A VDEQ letter of acknowledgment dated 2022-03-31 is included in the PDF but the addendum itself is dated 2020-12. I selected category 'South River Remediation Documents' and type 'Work Plan' because this is a technical execution plan/addendum describing remedial excavation; 'Work Plan' best reflects the implementation focus.