Presentation describing Phase 1 interim measures to reduce mercury (THg) transport from bank erosion in the upper 2 miles (RRM 0–2) of the South River. Covers erosion-rate analyses (LiDAR/regression), identification of Bank Management Areas (BMAs), interim stabilization alternatives (vegetative, structural, removal), pilot work, and a schedule calling for data collection in Oct/Nov and phased implementation.
File Type:
pdf
Categories:
SRST Meeting Documents
Publication Date :
2014-10-08
Type :
Presentation
Review Notes :
Date and audience taken from the title slide (Clay Patmont, Anchor QEA; South River Science Team; October 8, 2014). Slides provide BMA locations, erosion analyses, and schedule; no formal report or authoring organization beyond slide headers was inferred.
