Slide deck summarizing 2014 activities of the Remedial Options Program (ROP) for the South River. Covers field pilots (bank stabilization, pond biochar, proposed floodplain pilot), multiple university-led studies on mercury dynamics and biochar effects, and planning steps for Phase 1 Interim Measures including bank sampling, surveys, dendrochronology, hydrodynamic modeling, and LiDAR resurvey.