Slide presentation by Anchor QEA (Clay Patmont, Ryan Davis) proposing Phase 1 bank stabilization for mercury remediation on the South River. It outlines remediation proposal features, conceptual site model, estimated mercury loading sources, prioritization of Bank Management Areas, further evaluation plans (IHg soil sampling, bank stability metrics, LiDAR), and next steps including design, permitting, and landowner outreach.
File Type:
pdf
Categories:
Presentations
Publication Date :
2013-10-09
Type :
Presentation
Review Notes :
Date, authors, and slide content are visible on the PDF. It is a slide deck for a South River remediation proposal; unclear from the PDF whether this was delivered at an official SRST meeting (so category chosen as Presentations rather than SRST Meeting Documents).
