AECOM/URS memorandum (July 17, 2015) revises the Short-term Monitoring (STM) Plan for Area of Concern 4 at the Former DuPont Waynesboro Site. It describes revised habitat and in-channel metrics, monitoring locations and frequencies, success criteria, and analysis/reporting procedures, and incorporates habitat-function assessments (USM, EPW), benthic sampling, canopy, substrate and in-stream habitat evaluations.
File Type:
pdf
Categories:
South River Remediation Documents
Publication Date :
2015-07-17
Type :
Work Plan
Review Notes :
Document categorized as South River Remediation Documents because it is a monitoring-plan revision tied to Phase I Interim Measures (remediation) at the DuPont Waynesboro AOC-4. Document_type chosen as Work Plan because it defines monitoring methods, locations and success criteria rather than presenting monitoring results.