Memorandum reporting leaf‑off maintenance inspections conducted Dec 6–8, 2021 for five South River Bank Management Areas (Constitution Park, City Shops, Allied Ready Mix, Shiloh Baptist Church, and North Park). The report documents vegetation establishment, bank stability, condition of installed rock toe/erosion controls and geosynthetics, localized scour, invasive Japanese knotweed, and recommended monitoring and targeted maintenance.
File Type:
pdf
Categories:
Technical Documents
Publication Date :
2022-11-08
Type :
Monitoring Report
Review Notes :
Document is an AECOM memorandum dated 2022-11-08 summarizing inspections conducted Dec 6–8, 2021; the VDEQ cover letter acknowledging receipt is dated 2023-04-06. document_date uses the memorandum date (2022-11-08) because it is the primary report date. No other significant uncertainties.