Serving Waynesboro, Augusta County & the Shenandoah Valley

Search

Serving Waynesboro, Augusta County & the Shenandoah Valley

Slide presentation on Phase 1 interim measures to refine bank management areas (BMAs) within RRM 0–2 of the South River. It summarizes dendrochronology measurements of bank erosion from exposed tree roots, EFDC hydrodynamic modeling, regressions linking excess bank shear stress to erosion, LiDAR and mercury concentration inputs for estimating bank mercury loads, and a schedule for supplemental sampling and design.

File Type: pdf
Categories: Presentations
Tags: Anchor-QEA, bank erosion, bank-management-areas, dendrochronology, EFDC, hydrodynamic modeling, lidar, mercury, RRM 0-2, south-river
Publication Date : 2014-03-19
Type : Presentation
Review Notes : Deck is a presentation (Anchor QEA logo visible) dated March 19, 2014. RRM acronym appears on slides but its full form (likely Relative River Mile) is not explicitly defined in the PDF. Mercury loading results and BMAs are presented as preliminary; authorship beyond the firm logo is not specified.

Leave a Reply

Your email address will not be published. Required fields are marked *