Slide deck summarizes a biochar pilot study at AOC 4 (Former DuPont Waynesboro Site). It describes site selection, deployment of mid-channel cages and near-bank biochar-filled sleeves in April 2018, and five-week post-amendment monitoring (surface water, porewater, clams, and biochar). Preliminary biochar analyses required methods modification; a final evaluation and report were planned for Q4 2018.
File Type:
pdf
Categories:
Presentations
Publication Date :
2018-07-24
Type :
Presentation
Review Notes :
Slides provide deployment and monitoring photos, charts of surface-water THg and MeHg and clam results, and note that biochar sample analyses were delayed due to matrix interference. Numeric data points in charts were not transcribed from images; conclusions are limited to what is explicitly stated on slides.
