Slide presentation by Paul Bugas (DGIF) summarizing planned in‑stream fish habitat work and consideration of removal of the Rife Loth Dam on the South River. DGIF and Trout Unlimited plan rock structures (J‑hook, cross veins, W‑weir) with substrate disturbance; SRST interest in measuring mercury pre/post. Dam removal is under review but currently on hold.

File Type: pdf
Categories: Presentations
Tags: dam-removal, fish habitat, mercury (Hg), Paul Bugas, Rife Loth Dam, south-river, Trout Unlimited, Virginia Department of Game and Inland Fisheries
Publication Date : 2007-01-30