AECOM memorandum (March 24, 2021) documenting Jan. 18–20, 2021 leaf-off maintenance inspections of five Phase 1 bank management areas (Constitution Park, City Shops, Allied Ready Mix, Shiloh Baptist Church, North Park). Findings note generally stable remediation features, variable vegetation establishment, exposed geocell/erosion fabric after high flows, localized scour, and recommendations for reseeding, plantings, and invasive species control.