Slide deck presented at the South River Science Team Spring meeting summarizing Phase 1 Interim Measures at the former DuPont Waynesboro site (AOC 4). Topics include the South River mercury history, remediation goals and design criteria, construction sequence, Shiloh Baptist Church bank management area update, North Park pre-design work, and project status metrics and next steps.