Serving Waynesboro, Augusta County & the Shenandoah Valley

Search

Serving Waynesboro, Augusta County & the Shenandoah Valley

Slide presentation describing remedial design and permitting for South River Phase 1A bank management areas (BMAs). It outlines project objectives (reduce mercury loading, preserve habitat, minimize disruption), details plans for Constitution Park primary and secondary BMAs (erosion control, clearing, excavation, materials, planting, cross-sections), and provides a review/permit schedule targeting Fall 2016 and Spring/Summer 2017 construction.

File Type: pdf
Categories: Presentations
Tags: AECOM, Anchor-QEA, bank-management-area, clay-patmont, constitution-park, DuPont, mercury, Phase 1A, remedial-design, south-river, south-river-science-team
Publication Date : 2016-07
Type : Presentation
Review Notes : Date and author taken from the slide title (Clay Patmont, July 2016). Document is a standalone slide deck; not labeled as minutes or an SRST meeting record. No additional metadata (e.g., formal report number) is present in the PDF.

Leave a Reply

Your email address will not be published. Required fields are marked *